Electrical setup mobile measuring container

In the modern world of data collection and monitoring, measurement containers play a crucial role. Meetkast

The electrical installation in these units is essential for their functionality and efficiency.  

Commissioned by VITO, we are setting up two units. This research infrastructure was co-funded by FWO (project 1001025N).

The measurement container can be electrically powered by 220VAC or 380VAC, depending on what is available on site.

Completed works:

  • Development of electrical diagrams in Eplan
  • Each component has been selected and assembled with the utmost care to meet the highest standards.
  • Cabinet building
  • Assembly/wiring in the container
  • Power supply for air conditioning – measuring tracks – lighting

Do you need control panels, switchgear, or distribution systems? Contact us sales@pics.be 💡

Leave a Reply

Your email address will not be published. Required fields are marked *

Deze website gebruikt Akismet om spam te verminderen. Bekijk hoe je reactie-gegevens worden verwerkt.